Summer 2025 Access Control Drill AAR-IP

FallSummer 2025 FireAccess DrillsControl Drill AAR-IP

----------------------------------------------------------------

FallSummer 2025 FireAccess DrillsControl Drill

After-Action Report/Improvement Plan

SeptemberAugust 23,22, 2025

This After-Action Report/Improvement PlanNon-Confidential (AAR/IP) aligns exercise objectives with preparedness doctrine and related frameworks and guidance.NC): This AARdocument meetsdoes Homelandnot Securitycontain Exercisesensitive andand/or Evaluationconfidential Programinformation. (HSEEP)It guidelines.is Exercise information requiredavailable for preparednesspublic reporting and trend analysis is included.inspection.

Exercise Overview

Exercise Name

FallAccess 2025Control Fire DrillsDrill

Exercise DatesDate

SeptemberJune 22 & 23,24-26, 2025

Planning Date

August 11, 2025None

Hotwash Date

N/AAugust 6, 2025

Scope

This exercise is a drill,drill plannedand forevaluates approximatelythe 5ability minutesof appropriate agencies to be able to effectively control access to campus buildings and spaces. The scope was limited to testing whether the intended result from the access restriction was successful at each residenceapplicable hall.door. ExerciseParticipants playutilized isradio limited to activating the fire notification system in each building, monitoring the receipt and response by occupants, examining the notification systemcommunications for anyreporting failures,based andon documentingan allIncident observations.Radio Communications Plan (ICS 205).

Focus Areas[1]

Prevention, Protection, Mitigation, Response

Core Capabilities[2]

§  CommunityAccess ResilienceControl and Identity Verification

§  Infrastructure Systems

§  OperationalInterdiction Coordinationand Disruption

§  Planning

§  Public Information and Warning

ObjectivesTarget Capabilities

§  DetermineQuickly therestrict operationalaccess statusto ofcampus firebuildings notificationand systemsspaces

§  ExamineQuickly therestore ability of occupantsaccess to recognizecampus hazardbuildings communicationand messagingspaces

§  ExamineEnsure theproper occupant’smanagement, responsemaintenance, toand hazard communication messaging

§  Examine the abilitytraining of staffaccess tocontrol encourage and guide evacuation efforts

§  Evaluate the effectiveness of previous public information programs

§  Examine for hazards that may compound fire risk/consequencesystems

HazardAfter Action Report

Uncontained Fire

Scenario

Fire alarm activation signals the potential for a fire in the respective residence hall or living quarters.

SponsorOrganization

Arkansas State University

ParticipatingLead OrganizationsAgency

Office of Emergency Management

Participating Organizations

Blue Sky Technologies,

Facilities Management,

Information and Technology Services,

University Housing,

University Police Department

Dispatch

 

Note: Multiple campus offices/departments assisted in the drill phase.

Point of Contact

Wyatt Reed, Emergency Operations and Occupational Safety Specialist

Office of Emergency Management

Arkansas State University

WReed@AState.edu or (870) 972-3352

 Analysis of Capabilities

Table 1 includes the exercise objectives, aligned capabilities, and performance ratings for each capability as observed during the exercise and determined by the evaluation team.

and and

ObjectiveTarget Capabilities

Core Capability[3]

Performed without Challenges (P)

Performed with Some Challenges (S)

Performed with Major Challenges (M)

Unable to be Performed (U)

DetermineQuickly therestrict operationalaccess statusto ofcampus firebuildings notificationand systemsspaces.

CommunityAccess ResilienceControl and Identity Verification

X

 

 

 

InfrastructureInterdiction Systemsand Disruption

 

X

 

 

 

Public Information and WarningPlanning

X

 

 

 

ExamineQuickly therestore ability of occupantsaccess to recognizecampus hazardbuildings communicationand messagingspaces.

CommunityAccess Resilience

Control
Identity

X

 

 

 

Infrastructure SystemsVerification

X

 

 

 

Planning

X

 

 

 

PublicEnsure Informationproper management, maintenance, and Warningtraining of access control systems.

Access Control and Identity Verification

 

X

 

 

 

ExamineInfrastructure the occupant’s response to hazard communication messagingSystems

Community Resilience 

X

 

 

 

Planning

Interdiction

XDisruption

 

 

 

Examine the ability of staff to encourage and guide evacuation efforts

Community Resilience

X

 

 

 

Operational Coordination

X

 

 

 

Planning

X

 

 

 

Evaluate the effectiveness of previous public information programs

Community Resilience

X

 

 

 

Planning

X

 

 

 

Operational Coordination

X

 

 

 

Examine for hazards that may compound fire risk/consequence

Community Resilience

X

 

 

 

Table 1. Summary of Core Capability Performance

Rating Definitions:

Performed without Challenges (P): The targets and critical tasks associated with the capability were completed in a manner that achieved the objective(s) and did not negatively impact the performance of other activities. The performance of this activity did not contribute to additional health and/or safety risks for the public or for emergency workers, and it was conducted in accordance with applicable plans, policies, procedures, regulations, and laws.

Performed with Some Challenges (S): The targets and critical tasks associated with the capability were completed in a manner that achieved the objective(s) and did not negatively impact the performance of other activities. The performance of this activity did not contribute to additional health and/or safety risks for the public or for emergency workers, and it was conducted in accordance with applicable plans, policies, procedures, regulations, and laws. However, opportunities to enhance effectiveness and/or efficiency were identified.

Performed with Major Challenges (M): The targets and critical tasks associated with the capability were completed in a manner that achieved the objective(s), but some or all of the following were observed: demonstrated performance had a negative impact on the performance of other activities; contributed to additional health and/or safety risks for the public or for emergency workers; and/or was not conducted in accordance with applicable plans, policies, procedures, regulations, and laws.

Unable to be Performed (U): The targets and critical tasks associated with the capability were not performed in a manner that achieved the objective(s).

The following sections provide an overview of the performance related to each exercise objective and associated capability, highlighting strengths and areas for improvement.

Capability Definitions:

CommunityAccess Resilience: Enable the recognition, understanding, communication of,Control and planningIdentity forVerification: riskApply and empowersupport individualsnecessary physical, technological, and communitiescyber measures to makecontrol informed risk management decisions necessaryadmittance to adaptcritical to, withstand,locations and quickly recover from future incidents.systems.

Infrastructure Systems: Stabilize critical infrastructure functions, minimize health and safety threats, and efficiently restore and revitalize systems and services to support a viable, resilient community.

Operational Coordination: EstablishInterdiction and maintainDisruption: aDelay, unifieddivert, andintercept, coordinatedhalt, operationalapprehend, structureor andsecure processthreats thatand/or appropriately integrates all critical stakeholders and supports the execution of core capabilities.hazards.

Planning: Conduct a systematic process engaging the whole community as appropriate in the development of executable strategic, operational, and/or tactical-level approaches to meet defined objectives.

Exercise Design

Initial Design

PublicThe initial design of this exercise was executed by the A-State Campus Card Center, a division of Information and Warning: Deliver coordinated, prompt, reliable,Technology and actionableServices. informationThe goal of the exercise was to evaluate the performance of access control systems by evaluating the capabilities of the utilized software and evaluation of the physical hardware to respond to the wholesoftware’s communitycommand.

through

Campus administration and safety personnel were notified of the usetesting plan roughly 8-10 days before the planned execution of clear,the consistent,exercise. accessible,While this was a rapid turnaround, previous campus safety threats underscored the need to ensure the test was performed ahead of the Fall 2025 semester to evaluate the access control systems’ current efficacy and culturallyto mitigate any problems with the systems ahead of students’ arrival in August. However, this also offered little ability to significantly alter the design plan and linguisticallyto appropriatefully methodsunderstand the design.

The initial design called for 15-minute testing periods within a 4-hour window. One building would be tested within that 15-minute testing period, except when the size of the building would justify including more buildings within the same testing period.

Resources needed included:

  • Contractors: Contractors from Blue Sky Technologies were on-site to effectivelyassist relaywith informationhardware regardingand anysoftware-related threatissues.
  • or
  • Personnel: hazard,Personnel physically evaluated and verified the status of access control doors, as well as activating/deactivating software and responding to hardware issues.
  • Radios: The Chief of University Police procured radios to disperse to personnel assisting with the actionsexercise. Additional portable radios were brought by certain participating departments that already had them.
  • Software: A software program was utilized to develop shortcuts (also known as “threat levels”) to quickly effect the desired outcome.
  • Temporary Card Access: Temporary cards had to be printed with basic all-access and with UPD-only all-access for personnel to assess the access control systems.
  • Transportation: While the exercise group often sought to test buildings near each other, ultimately, university and private vehicles, golf carts, etc., were utilized to move personnel from one test site to another.

Design Adjustments

The main initial design was adjusted to be performed in 3 days, not 2. Additionally, testing windows were moved from 15-minute periods to 20-minute periods (generally). As the drills were performed, the schedule was altered based on available personnel and needs.

Issues Identified:
  • Planning was not adequately performed for this exercise. A longer planning period was needed, and more stakeholders needed to be involved in that plan.
    • Drill evaluation forms contained unclear or misleading questions that produced a likely bias and/or holes in the data.
    • Personnel were not pre-identified or assigned. This caused scheduling issues. For example, when available personnel did not meet the demand for the number of doors being takentested, time delays were created. When available personnel exceeded scheduled needs, the schedule was changed without advance notice, causing operational impacts to campus members.
    • Respondents to the participant survey noted a lack of available transportation.
    • There were too few resources, such as radios and access cards.
  • More periodic preventative maintenance checks on access-controlled doors are needed.
    • While it would be unreasonable to expect the physical infrastructure of all access-controlled doors on campus to always function properly, more resources and planning seem needed to identify hardware issues as they occur on access-controlled doors.
  • Accessibility issues continue to plague campus access.
    • ADA issues were prevalent – many ADA-type features were unable to be tested on access-controlled doors because ADA devices were not installed.
Successes Identified:
  • The planning within the software worked exactly as planned, and few (if any) software failures were noted throughout the drills.
  • The access-controlled capability worked exceptionally well, and the assistanceprocess beingto madecontrol available,spaces has been and is continuing to be drastically improved upon. UPD’s Dispatch Center will soon be able to activate and control these systems even quickly.
  • Campus involvement in the drill was outstanding, especially given the particularly busy time of the year, short notice, and last-second scheduling changes.

 

 

Data Categorization Process

The supporting sample data that informed the results presented in the next section was collected through evaluation forms that participants completed for each door and scenario. The data is classified as appropriate.

Residence Hall Breakdowns:

This area will identify the strengths and weaknesses of each residence hall as it relates to exercise objectives and core capabilities.

Living-Learning Communities (LLCs)

Living-Learning Community (LLC) #1

Time: 2:47 | Number Evacuated: 24follows:

  • Observations:Working Exercise exceededAppropriately: all requirements.
  • features
of
Living-Learningthe Communitydoor (LLC)worked #2
as

Time:expected 2:40in |permitting Numberor Evacuated:restricting 26

access
    in
  • Observations:accordance Exercisewith exceededthe allexpected requirements.
Living-Learning Community (LLC) #3

Time: 3:45 | Number Evacuated: 27

  • Observations: Exercise exceeded all requirements.
Living-Learning Community (LLC) #4

Time: 3:40 | Number Evacuated: 33

  • Observations: Exercise exceeded all requirements.
Living-Learning Community (LLC) #5

Time: 5:24 | Number Evacuated: 21

  • Observations: Exercise exceeded all requirements.
Living-Learning Community (LLC) #6

Time: 3:27 | Number Evacuated: 29

  • Observations: Exercise exceeded all requirements.

Miscellaneous Residence Halls

Arkansas Hall

Time: 8:10 | Number Evacuated: 34

  • Observations: Exercise exceeded all requirements.
Kays Hall

Time: 6:01 | Number Evacuated: 80

  • Observations:result. A cardoor wasthat parkedis unattendedworking inappropriately needs no further action at this time.
  • Partial Failures: a feature(s) of the firedoor lane.did Additionally,not heavywork rainas impactedexpected; however, the ability to safelycontrol access remained intact, or at least maintained a fail-secure state.
  • ADA-Only Failures: the accessibility features of the door were the only feature of the infrastructure that did not meet the access control expectations.
  • Complete Failures: a feature(s) of the door did not work as expected and, as a result, the ability to control access was lost.
  • Unable to Test: an issue or fact existed that prevented the ability to effectively and/or fairly test the ability to control access.

NOTE: each door was only counted in one of these categories. For instances where more than one condition could apply, the most applicable category is applied.

Common Issues

Many of the same types of issues were noted within each respective category. 89 access-controlled spaces were logged as having issues. Of these 89, 52 (58.43%) required a work order to be fixed. The remaining doors were either fixed on site or another fact existed that did not require the submission of a work order. Of the 52 submitted, 27 (51.92%) have been closed while the rest remain open. Common issues included:

  • Physical failures (broken locks, broken doors, missing infrastructure, etc.)
    • Most issues noted were due to some physical failure. These could be greatly reduced through more routine maintenance and proper usage by the campus community.
  • Technology failures (communication failures, glitches, etc.)
    • These primarily existed when the hardware did not respond to the technology’s commands. The software, by and large, worked appropriately.
  • ADA failures (missing infrastructure, etc.)
    • Data probably has a gap here, as the exercise atwas not intended to robustly test our ADA system’s integration and infrastructure.

Normal Access Mode

In the veryNormal end.Access Mode, access is granted based on the normal permissions of the door. Both the base all-access card and the UPD-only all-access card should grant entry.

Unadjusted Results:
  • Working Appropriately:
    • Regular Card: 280 of 317 (88.33%)
    • UPD-Only Card: 282 of 317 (88.96%)
  • Partial Failures:
    • Regular Card: 8 of 317 (2.52%)
    • UPD-Only Card: 3 of 317 (0.95%)
  • Complete Failures:
    • Regular Card: 6 of 317 (1.89%)
    • UPD-Only Card: 1 of 317 (0.32%)
  • Unable to be Tested:
    • Regular Card: 23 of 317 (7.26%)
    • UPD-Only Card: 31 of 317 (9.78%)

Discrepancies: Normal Access Mode results are based on the data from the Inclement Weather Access Mode test. As a result, there is no means in place to verify the correct starting state of the doors. It is assumed that the starting state of the doors was correct relative to those doors scheduled state. If a door was locked or unlocked when it was scheduled to be the opposite, that will not be reflected as a failure in the results.

Inclement Weather Access Mode

In the Inclement Weather Access Mode, access is granted based on the normal permissions of the door. Both the base all-access card and the UPD-only all-access card should grant entry. No other changes, EXCEPT: in the Student Union, all exterior doors with access control should unlock with no card required for entry.

Unadjusted Results:
  • Working Appropriately:
    • Regular Card: 300 of 344 (87.21%)
    • UPD-Only Card: 299 of 344 (86.92%)
  • Partial Failures:
    • Regular Card: 8 of 344 (2.33%)
    • UPD-Only Card: 3 of 344 (0.87%)
  • Complete Failures:
    • Regular Card: 11 of 344 (3.20%)
    • UPD-Only Card: 6 of 344 (1.74%)
  • Unable to be Tested:
    • Regular Card: 25 of 344 (7.27%)
    • UPD-Only Card: 36 of 344 (10.47%)

Discrepancies: There is no means in place to verify the correct starting state of doors. It is assumed that the starting state of the doors was correct relative to those doors scheduled state. If a door was locked or unlocked when it was scheduled to be the opposite, that will not be reflected as a failure in the results.

UPD-Only Access Mode

In the UPD-Only Access Mode, access is no longer granted based on the normal permissions of the door. The base all-access card should not grant entry. The UPD-Only all-access card should grant entry.

Unadjusted Results:
  • Working Appropriately:
    • Regular Card: 259 of 344 (75.29%)
    • UPD-Only Card: 215 of 344 (62.50%)
  • Partial Failures:
    • Regular Card: 5 of 344 (1.45%)
    • UPD-Only Card: 8 of 344 (2.33%)
  • Partial Failures (ADA Only):
    • Regular Card: 29 of 344 (8.43%)
    • UPD-Only Card: 58 of 344 (16.86%)
  • Complete Failures:
    • Regular Card: 18 of 344 (5.23%)
    • UPD-Only Card: 21 of 344 (6.10%)
  • Unable to be Tested:
    • Regular Card: 33 of 344 (9.59%)
    • UPD-Only Card: 42 of 344 (12.21%)

Discrepancies: 38 doors (Regular Card) and 0 doors (UPD-Only Card) were likely improperly biased during testing to be placed in the complete failures category when these doors most likely worked without issue. As a result, these doors were moved during data analysis to the working appropriately category. However, it is possible that a few of these doors should be in the complete failures category.

No Access Mode

In the No Access Mode, access is no longer granted based on the normal permissions of the door. The base all-access card and the UPD-Only all-access card should not grant entry.

Unadjusted Results:
  • Working Appropriately:
    • Regular Card: 259 of 344 (75.29%)
    • UPD-Only Card: 255 of 344 (74.13%)
  • Partial Failures:
    • Regular Card: 3 of 344 (0.87%)
    • UPD-Only Card: 4 of 344 (1.16%)
  • Partial Failures (ADA Only):
    • Regular Card: 19 of 344 (5.52%)
    • UPD-Only Card: 16 of 344 (4.65%)
  • Complete Failures:
    • Regular Card: 16 of 344 (4.65%)
    • UPD-Only Card: 15 of 344 (4.36%)
  • Unable to be Tested:
    • Regular Card: 47 of 344 (13.66%)
    • UPD-Only Card: 54 of 344 (15.70%)

Discrepancies: 38 doors (Regular Card) and 37 doors (UPD-Only Card) were likely improperly biased during testing to be placed in the complete failures category when these doors most likely worked without issue. As a result, these doors were moved during data analysis to the working appropriately category. However, it is possible that a few of these doors should be in the complete failures category.

Aggregated Results

The following are the aggregated results of all specific access modes combined.

Unadjusted Results:
  • Working Appropriately:
    • Regular Card: 1,098 of 1,349 (81.39%)
    • UPD-Only Card: 1,051 of 1,349 (77.91%)
  • Partial Failures:
    • Regular Card: 24 of 1,349 (1.78%)
    • UPD-Only Card: 18 of 1,349 (1.33%)
  • Partial Failures (ADA Only):
    • Regular Card: 48 of 688 (6.98%)
    • UPD-Only Card: 74 of 688 (10.76%)
  • Complete Failures:
    • Regular Card: 51 of 1,349 (3.78%)
    • UPD-Only Card: 43 of 1,349 (3.19%)
  • Unable to be Tested:
    • Regular Card: 128 of 1,349 (9.49%)
    • UPD-Only Card: 163 of 1,349 (12.08%)

Exercise Executive Notes

Overall Evaluation

Overall, the exercise was a success. This is especially true given all the specific parameters and circumstances surrounding it. More follow-up testing will be needed to verify the data collected, although it is likely a fair statistical overview.

Player Feedback

Overall Evaluation

Players overall provided positive feedback. 19 respondents completed the evaluation form out of 60 players who received the evaluation form link (a 31.67% response rate).

Player Evaluation Form

The Office of Emergency Management conducted evaluation polling via a Microsoft Form that was sent to each registered player. Respondents were given 7 days to respond to the evaluation, and responses were not compelled. The form is composed of two parts: a questionnaire utilizing the Likert Scale that was designed to collect more quantitative data, and a short answer/listing section designed to collect more qualitative data.

The success of the exercise based on the Part A evaluation results was determined using a combination of median and mode statistical analysis products (Success = x̄>3 AND Mo>3). The success formula was based on the idea that, on average (i.e., the mean), more people should feel better than neutral about the organization and results of the exercise. In addition to that, the category with the most responses (i.e., the mode) should be in an affirmative stance (“agree” or “strongly agree”) that corresponds to a positive outlook on the exercise design, results, and function.

Part A: Likert Scale Questionnaire

In all questions, the respondent was asked to rank their agreement with a statement regarding the exercise. The options were: Strongly Disagree (1), Disagree (2), Neutral (3), Agree (4), and Strongly Agree (5). All questions were worded in a positive, affirmative stance.

Question #1: The exercise wasseemed suspendedwell dueplanned.
to

Results:

safety,
    although
  • Mean: most4.21
  • occupants
  • Mode: had already exited.4
UniversityQuestion Hall#2: The exercise seemed to be punctual and stayed on schedule.

Time: 4:13 | Number Evacuated: 71Results:

  • Observations:Mean: Residents3.42
  • had
  • Mode: {5,4,3}
Question #3: Instructions by facilitators to beyou remindedwere severalclear timesand toeffective.
move

Results:

  • Mean: 4.26
  • Mode: 5
Question #4: You felt comfortable participating in the exercise.

Results:

  • Mean: 4.68
  • Mode: 5
Question #5: You felt comfortable providing your input to the correctexercise assemblygroup.
area,

Results:

but
    staff
  • Mean: 4.68
  • Mode: 5
Question #6: You felt able to quickly identify the next steps that should be taken while assisting in the exercise.

Results:

  • Mean: 4.42
  • Mode: 5
Question #7: The systems used (radio, forms, etc.) aided and were useful.

Results:

  • Mean: 4.42
  • Mode: 5
Question #8: The physical requirements (e.g., walking, stairs, etc.) were communicated and did annot excellentpose joba ofchallenge.
noticing

Results:

this
    and
  • Mean: implementing4.47
  • corrections
  • Mode: without5
  • facilitator
intervention!
Response Distribution Overview

Aggregated Results:

  • Mean: 4.32 (x̄>3, SUCCESS)
  • Mode: 5 (Mo>3, SUCCESS)

NorthparkPart QuadsB: Feedback Form

NorthparkQuestion Quad#1: #1Please list up to 3 areas of strength (things that you felt went well) noted from this exercise.

Time:Responses 6:12 | Number Evacuated: 38included:

  • Observations:Fluidity Floorof 1the bothexercise.
  • Center
  • Patience, Mag, Floor 2 Center Stairwell, North Stairwell,attentiveness, and Northflexibility Mag,of Floor 3 South Stairwell doors not latching.players.
  • Response:System OEMconfiguration willwas workaccurate and worked as expected.
  • Maintenance needs were identified, with Universitymany Housingfixed andin FMreal-time.
  • for
  • Assistance corrections.available.
NorthparkQuestion Quad#2: #2Please list 3 areas of improvement (things that you feel we could do better) noted from this exercise.

Time:Responses 4:52 | Number Evacuated: 35included:

  • Observations:More Floorresources, 1including North Stairwell, Floor 2 South Stairwell, Floor 3 North Stairwelltransportation and Centerradios.
  • Stairwell
  • Clearer doors propped. Floor 1 North Maginstructions and Floorresources, 3such Centeras Stairwellforms doorsand are not latching. Floor 1 South Mag door bracket is missing. Floor 3 Mag doors did not release.maps.
  • Response:More OEMcomprehensive willplanning workcycle.
  • with
  • Increase Universitycampus Housing and FM for corrections. OEM will work with Life Safety to correct the missing bracket/no release.accessibility.
NorthparkQuestion Quad#3: #3What steps would you take to rectify concerns noted in question #2?

Time:Responses 4:29 | Number Evacuated: 41included:

  • Observations:Procure Floormore 1resources, Eastincluding Stairwellradios, transportation, and Westaccess Mag door does not latch. Floor 2 West door is propped. Floor 3 Center Stairwell auto-closer broken.cards.
  • Response:Send OEMa willreminder workemail/communication.
  • with
  • Utilize Universitythe HousingOffice of Emergency Management expertise and FMresources in planning.
  • Adding in scheduled time and processes for corrections.“onboarding” volunteers.
NorthparkFinal QuadStep: #4Please list any additional comments or concerns that you may have.

Time:Responses 4:23 | Number Evacuated: 52included:

  • Observations:Appreciation Allfor 3willingness Centerto Stairwell doors propped. Floor 1 South Stairwell, Floor 2 South & North Stairwell,implement and Floortest 3this South Mag doors do not latch.system.
  • Response:Everyone’s OEMwork, will work with University Housingeffort, and FMpatience forin corrections.participating in this exercise.
Northpark Quad #5

Time: 5:09 | Number Evacuated: 62

  • Observations: Floor 1 & 3 center stairwell fire doors propped. Floor 3 center door hangs on the door stop. Floor 2 South Mag, North Stairwell, and Floor 3 North Stairwell doors do not latch.
  • Response: OEM will work with University Housing and FM for corrections.

Pack Place

Pack Place #1

Time: 4:37 | Number Evacuated: 50

  • Observations: Exercise exceeded all requirements. Scooter was being stored under the stairwell. This is a fire hazard and a violation

    Areas of University Housing policy.

  • Response: A picture and report were sent to UPD, who will follow up with the REC to identify the owner and refer to OSC.
Pack Place #2

Time: 8:22 | Number Evacuated: 55

  • Observations: Resident did not evacuate. The resident and an involved person were reported to OSC by the REC.
Strength

Red Wolf Den

Red Wolf Den #1

Time: 3:10 | Number Evacuated: 16

  • Observations: Exercise exceeded all requirements.
Red Wolf Den #2

Time: 4:43 | Number Evacuated: 19

  • Observations: Exercise exceeded all requirements.
Red Wolf Den #3

Time: 3:36 | Number Evacuated: 13

  • Observations: Exercise exceeded all requirements.

Sorority Houses

Zeta Tau Alpha

Time: 2:35 | Number Evacuated: 13

  • Observations: Exercise exceeded all requirements.
Alpha Gamma Delta

Time: 1:08 | Number Evacuated: 6

  • Observations: Exercise exceeded all requirements.
Alpha Omicron Pi

Time: 1:26 | Number Evacuated: 14

  • Observations: Exercise exceeded all requirements.
Chi Omega

Time: 1:17 | Number Evacuated: 4

  • Observations: Exercise exceeded all requirements.
Delta Zeta

Time: 2:10 | Number Evacuated: 7

  • Observations: Exercise exceeded all requirements.

The Circle:

The Circle Building #1

Time: 4:23 | Number Evacuated: 31

  • Observations: Exercise exceeded all requirements.
The Circle Building #2

Time: 4:13 | Number Evacuated: 13

  • Observations: Exercise exceeded all requirements.
The Circle Building #3

Time: 4:27 | Number Evacuated: 20

  • Observations: Exercise exceeded all requirements.
The Circle Building #4

Time: 3:47 | Number Evacuated: 12

Observations: 3 individuals reported due to failing to evacuate.

Strengths

Strength 1 (StaffAccess-Control Leadership):Capabilities) University

One Housing staff effectively controlledof the responseleading strengths that was noted from our exercise is our ability to drillsaccess control so many doors across campus, especially in critical spaces. While a large amount of work remains, A-State is continuously making positive strides towards a safe and secure environment by directinginvesting residents,money, notifying UPD,time, and followingpersonnel establishedinto procedures.access-control Theinfrastructure. facilitatorAfter rarelymost active threat events at universities (ifincluding ever)larger hadinstitutions, such as Michigan State and Florida State), access control is a major point of discussion. Our software and, to assista ingreat directingextent, residentsour orinfrastructure, assistingworked Universitywell Housingduring Staff.this exercise. (Capability: CommunityAccess Resilience,Control Operationaland Coordination,Identity Planning)Verification, Infrastructure Systems, Interdiction and Disruption)

Strength 2 (KnowledgeAccess-Control Training and Program Management)

The Access Team that works underneath A-State ITS has seemingly done a fantastic job of andbuilding Adherenceour access-control systems into a comprehensive program. In addition to Procedures):expanding Fewercapacity issuesand arecapabilities, notedthis ofteam failurehas also worked hard to complycreate/update withaccess establishedpolicies proceduresas well as remediate pre-existing program issues. The ITS team is continuing to expand the program and increasedinclude usagemore ofcampus assembly areas. Few student conduct referrals were needed in this exercise. Staff were receptivepartners and engaged in fulfilling exercise needs and requirements.training. (Capability: CommunityAccess Resilience,Control and Identity Verification, Infrastructure Systems, Interdiction and Disruption, Planning)

Strength 3 (Campus Involvement)

Another strength noted from this exercise was the willingness of the A-State campus community to unite to meet the needs this exercise required for an effective test. Numerous personnel, including students, staff, and faculty, participated in the exercise directly. Virtually the entire campus was affected at some point by restricted access, yet the campus overwhelmingly welcomed the exercise. This commitment to campus safety and security is critical to building a resilient community. (Capability: Planning)

Areas for Improvement

Improvement Area for Improvement 1 (PassivePlanning)

Systems

The greatest area of improvement for this exercise is in planning. Better and more reliable data could likely have been collected through differently worded questions, forms, and processes. Delays and other challenges could likely have been planned for and either mitigated or prepared for with advanced planning. Additionally, better exercise design and documentation could have been available with earlier involvement of the Office of Emergency Management. (Capability: Planning)

Improvement Area 2 (Maintenance):

More systematic preventative maintenance checks are needed for access-control infrastructure. It has to be understood that we will never be able to always prevent one of these systems from breaking. However, the exercise revealed that we could do a better job in planning preventative maintenance and preventing the quantity/downtime of impacted infrastructure. (Capability: Infrastructure Systems, Planning)

Improvement Area 3 (Accessibility)

Accessibility is a concern in multiple parts of our campus operations. In this context, we likely need to better understand our expectations of ADA systems and infrastructure if a particular access mode is needed, and then plan for a way to make the ADA systems compatible and responsive to that expectation. Many passiveinfrastructure fireand protectionprogramming failures were noted in this drill in relation to ADA systems. Most of these failures would not compromise access-controlled spaces, but the systems are not being adequately maintained in residential facilities. Kays Hall was an example of this, and A-State facilitated a recent upgrade to come back into compliance. More buildings are at risk of this if adherence isstill not obtainedoperating soon.appropriately.  (Capability: Community Resilience, Infrastructure Systems, Planning)

Appendix A:A.1: Exercise Day 1 Schedule

 

Appendix A.2: Exercise Day 2 & 3 Schedule

Appendix B.1: Exercise Day 1 ICS 205 Form

Appendix B.2: Exercise Day 2 ICS 205 Form

Appendix B.3: Exercise Day 3 ICS 205 Form

Appendix C: Improvement Plan

This IP is developed specifically for Arkansas State University as a result of the drillsAccess Control Drill conducted in the FallJune of 2025:

Office

Area for Improvement

Corrective Item

Implementation Plan

Primary Responsible Organization

Organization POC

Passive Systems MaintenancePlanning

AssessExercise StatusDesign of Current Passive SystemsPlanning

AllFor passivefuture fireexercises, protectiona systemsmore inrobust university-ownedexercise housingdesign needplan needs to be assessedcreated toin determineconjunction theirwith state.

the
of

Emergency Management

(Primary)OEM) and other key partners.

EmergencyITS Management:

Ronnie Gilley or Doug Mayhugh

Identify Needed Repairs or Projects for Compliance

Based on the assessment performed, a plan for repairs or projects to repair to bring systems back in compliance should be created and carried out.

Facilities Management (Primary)

 

Emergency Management (Secondary)

Facilities Management:ITS:

BrianHeather LaseyBoothman or PetreeBethany BufordAdams

 

Emergency Management:

Ronnie Gilley or Wyatt Reed

Create a Preventive Maintenance Program and Training Plan

OncePreventative complianceMaintenance is ensured, attention to maintaining that compliance through preventive maintenance and training proper use of the systems should be done.Checks

FacilitiesIncrease Managementpreventative maintenance checks and documentation to ensure the university is limiting the number of doors that are in a “down” status, as well as the amount of time doors are in a “down” status.

ITS

(Primary)

 

UniversityFacilities HousingManagement (Secondary)

ITS:

Tony Marshall or Dane Buck

 

Facilities Management:

Zone Maintenance

Accessibility

ADA & Access Control Expectations

Create a list of expectations for each related ADA system in normal and all other access mode states. Additionally, compare the results of this/future exercises to this list of expectations to determine the efficacy of ADA systems relative to access controls.

ITS

(Primary)

ITS:

Heather Boothman or Bethany Adams

Increasing ADA Access

Continuing to inventory ADA capabilities and target needs to identify gaps. Create plans and solutions to allocate resources to ADA compliance initiatives.

Facilities Management

(Primary)

 

ITS

(Secondary)

Facilities Management:

Brian Lasey

 

University Housing:ITS:

NatalieTony EskewMarshall andor JennyDane KellerBuck

 

 

[1] Selected from National Preparedness Goal’s Five Mission Areas (DHS, 2015)

[2] Selected from National Preparedness Goal List of Core Capabilities (DHS, 2015)

[3] Selected from National Preparedness Goal List of Core Capabilities (DHS, 2015)